Equatorial Guinea JT8

Front guard plate: round hole front guard plate Installation method: bolt fixed

Product Description

Type of Tread Nosing Installation
JT8 Perforated Plate Nosing Bolted fixing

 

 

SIGN OF STAIR TREAD

 

PACKING

 

Regarding the side plate of tread, please see the below picture.And please check the chart to see the relation between width & hole pitch of tread.

 

The side plate adopts 65x5 mm bearing bar. It's only mitred when requesting from customers.

 

  (mm)
  Bearing bar pitch
  (mm)
  Recommended    Width
  30 125 155   185 215 245 275 305
  40 125 165     一 205 245 285 325
  (mm)
  Spacing of Fixing Hole
  45 75   75 100 100 150 150